Murray Basin
Station: Lock 9 Upper


GRDC Station Information
STN Derived Subbasin Information
Station Name (GRDC ID): Lock 9 Upper (5204268) Basin Name: Murray
River Name: Murray Next Downstream Station:None
GRDC Country Code: AU Distance to Next Downstream Station: N.A.
Start Year [Month]: 1965 [1] Upstream Station(s): None
End Year [Month]: 1984 [12]
Mean Discharge: 257 m3/s
Minimum Discharge: 12 m3/s
Maximum Discharge: 2044 m3/s Length of Upstream Mainstem: 1476 km
Mean Interstation Discharge: -28205 m3/s Distance to Basin Outlet: 337 km
GRDC Catchment Area: 991000 km2 STN Catchment Area: 972414 km2
GRDC Interstation Area: 394700 km2 STN Interstation Area: 972414 km2
GRDC Station Runoff: 8 mm/yr STN Station Runoff: 8 mm/yr
GRDC Interstation Runoff: -2254 mm/yr STN Interstation Runoff: -915 mm/yr
Station Field DescriptionsBasin Field Descriptions


Download
Site Descriptor Information Station Time Series Data


Hydrograph Station Data
Extreme Values Over Period Of Record
Month MeanQ
m3/s
MinQ
m3/s
MaxQ
m3/s
Jan 159.1 12.0 587.0
Feb 114.5 21.0 666.0
Mar 81.4 21.0 307.0
Apr 99.1 22.0 493.0
May 143.2 20.0 661.0
Jun 187.2 19.0 1002.0
Jul 237.6 25.0 1427.0
Aug 271.5 19.0 983.0
Sep 426.2 32.0 1534.0
Oct 508.2 30.0 1986.0
Nov 483.4 24.0 2044.0
Dec 371.5 22.0 1777.0